Hello. The installation process of our fixed concrete plant with a production capacity of 200m³ per hour, 160m³ Bunker, 100 Ton Bolted Silos, 5m³ Twinshaft mixer, Belt Conveyor and all other equipment has been completed and production has started.
Hello. The installation process of our fixed concrete plant with a production capacity of 200m³ per hour, 160m³ Bunker, 100 Ton Bolted Silos, 5m³ Twinshaft mixer, Belt Conveyor and all other equipment has been completed and production has started.
Factory 1: Orhaniye mah., 2051. Cadde, No: 65/A, Kahramankazan, ANKARA/TURKEY
Factory 2:Bayraktar Cad. ANSA Sanayi Sitesi, 1-K,
1-L, Saray, Kahramankazan, ANKARA/TURKEY